Slope from rise and run
- Input
- Rise 1 m and run 20 m.
- Method
- Divide rise by run and convert to percent and angle.
- Formula
- slope % = 1 / 20 x 100
- Intermediate steps
- Slope percent = 5%.
- Gradient ratio = 1:20.
- Angle = 2.862 degrees.
- Final result
- A 5% grade is a common planning value but must be checked against local criteria.
- Interpretation
- Useful for quick road and ramp comparisons.
- Limitation
- Does not verify drainage, accessibility, sight distance, or vehicle performance.